INDEX
Spillway Dam, constructionof, 229-235, 250-251,253, 254
operation of gates of, 186,255
Spillway Hill, water-pressureexperiments at, 170,171
Spillways, 167, 184-186, 250-255, 286, 287Statistics:
cost of Panama Canal con-struction, 324-327Culebra Cut, excavation of,270
French excavation work,13, 14
water supply for locks,33
Steam shovels, 63, 64, 65, 77,78, 82, 87, 88, 192, 193,
194, 203, 204, 205, 228,236
efficiency in operation of,77, 78, 274
Steams, Frederick P., 17, 19,22
Stevens, John F., 2, 3, 20on lock-canal plan, 25Stickle, Horton W., 8Storage of concrete material,215, 216, 289
Street-paving in Panama andColon, 59
Sullivan, John G., 3Swamp drainage by dredge,
195, 293
Telephones, 83Thatcher, Maurice H., 4, 6Tidal variations, between At-lantic and PacificOceans , 281, 282in Miraflores Locks, 287Time of passage through Pan-ama Canal , 35, 36Tincauzer, Eugen, 17, 19Tolls, 312
Toro Point quarry, 190Towing locomotives, 174, 182,183, 314, 315
Track-shifting in Culebra Cut,275
Transportation, of Colon wa-ter supply, 45, 46of concrete materials, 200-202, 215, 290
of construction material,40, 41, 188-192of food supplies, 46, 47, 48,105
Trestles, for concrete storage,289
for dumping fill, 155, 156,190-192, 208, 231-234,236, 249, 255Tubby, William G., 3Typhoid epidemic in Gatun,297
Unloaders, 90
Valves at lock gates, 179, 180
Walker, John G., 1Wallace, John F., 2, 20
338