Band 
Vol. I.
Seite
105
Linksdrehung 90°Rechtsdrehung 90° 
  
  
  
  
  
 
JPEG-Download
 

PASS OF THE SPLUGEN.

105

mere mule path—at the head of his division; and after a series of disasters, sup-ported with unparalleled fortitude, carried it on to victory in the plains ofMarengo.

Having briefly stated, in a former page, the great international benefits resultingfrom the new route over the Bernardino, we shall here also offer a few particularsrespecting the still greater undertaking on the part of the Austrian government,by which the route over the Splugen has been adapted to carriage intercourse.The works, which were begun in 1818, under the direction of the head engineer,Donegana,* involved questions of the deepest interest in that science, as well asinnumerable dangers from those natural causes against which it was impossible, bythe lessons of experience or scientific calculations, to provide. The successwhich had crowned the works on the Simplon, however, had given such encourage-ment to every similar enterprise, that what had previously appeared insurmount-able by human art, now assumed a perfect feasibility. The mind of the engineer,stimulated to redoubled exertion by the example of his predecessors, and the spurof more recent competition in the pass of the Bernardino, seems to have broughtthe whole weight of experience to bear upon this, the last field where suchdifficulties presented themselves; and, in the success of his undertaking, hasadded one more to those wonderful monuments already existing in the passes ofthe Alps. Among the numerous obstacles which opposed the execution of thishardy design, were, the peculiar hardness of the rocks to be split—the precipicesto be bridged over or blocked out—the torrents and avalanche-tracks to bediverted, or otherwise disarmed and modified in their violence—the constantdifficulty of preserving an uniform descent where the mountain was shattered andprecipitous;—here to suspend the route along the flank of chasms, and thereagain, as in the Simplon, to carry it through the solid rock, or protect it byarches. Besides the numerous works upon which the road itself was supported,the engineer had to construct four arched galleries, varying in length from 300to 600 feet and upwards, with three houses of refuge. In the plan and construc-tion of the whole route, the happiest combination of elegance and solidity isevery where apparent; it preserves a nearly uniform breadth of from fifteen toeighteen feet,! protected, on every assailable point, by strong wooden balus-trades, and with a slope and ascent so gradual, as scaicely to require muchadditional strength or precaution on the part of the conductor or his team.

* Antonio Talachini, of Milan, was the aspaltatore, or engineer in chief, for the route of the Splugen ,and Donneganna his assistant.— Brockedon. Les travaux furent confies 4 la Compagnie Talachini,sous la direction de M. Donegana. Ebel .

f The breadth within the Austrian frontier is eighteen, in that of the Grisons , fifteen feet.