23
REMARKS.
In the foregoing calculations, the durability of cast-ironsleepers in main lines is taken at 20 years, and in branch lines.25years, and that of creosoted sleepers at 15 in main, and 20 yearsin branch lines.
The durability here estimated for wooden sleepers—viz., 20and 15 years—exceeds what is usually regarded as a fair average;but still the estimated cost of renewal in the main lines muchexceeds what average experience has hitherto indicated — viz.,about 100k per mile, as stated in the introductory remarks.
This discrepancy is probably owing to the fact that the ageof railways is not sufficient to determine the full cost of renewal,so that the estimated result may be regarded as being the nearestapproach to the truth.
It will be seen, from the estimated cost of renewal, that thesaving of the cast-iron road, as compared with an ordinary timberroad, with a similar bearing surface, is 33/. 4s. per single mile perannum, equal to 531,200/. on the whole mileage of the kingdom.
The weight of double-headed rail, in the foregoing esti-mates for the cast-iron road, is the same as that of the ordinarytimber road; it is, however, the opinion of some engineers oflong experience, that., in the cast-iron road, from its giving somuch longitudinal support, a lighter rail by 10 lbs. per yard maybe used with equal effect; which would reduce the first cost veryconsiderably, as compared with the timber road.
The use of cast-iron sleepers has be:en gradually, althoughsomewhat slowly, increasing; many of the early trials werenot successful for want of a proper disposition of the metal, andit was at one time further retarded by the high price of iron,