THEORY AND PRACTICE OF ENGINEERING.

Book II

for stucco, with which the facings in moellon are sometimes covered, is nearly the same asthat of the pointing, the quantity of mortar being a little greater.

Incidental Expenses on Mason's Work consist in the maintenance of the machines used,timber and cordage for scaffolding, saws, sieves, roller, pincers, &c. The tools for cuttingand laying the stones belong to the workmen: these incidental expenses amount to aboutone tenth of the labour.

Iron-work. — A smith usually works, winter and summer, twelve hours per day.

There is employed in themanufacture of a kilo-gramme of iron

Loss of iron may be va-lued at

The volume of coal usedfor a kilogramme.

{

{

{

Smith andhis Assistant.

For iron of large dimensions, as ties, &c. - 0*10

For cramps, &c. - 0*40

For pins, bolts, &c. - 0*70

Of the Pri-mitive Weight.

For the first ----- 0*03

For the second - 0*08

For the third ----- 0*10

Cube Metres.

For the first - - - - 0 0001

For the second - 0 0006

For the third ----- 0*0010

For a kilogramme of iron,including carriage

Making the screw ends of bolts, according to their size, requires from 0*2 to 0*5 hours ofa smith for the screw and its nutt: with regard to the placing or fixing ironwork, if it isdone by the smith it may be valued at

Hours of a Smithand his Help.

" For the first class - 0*04

For the second - - - 0*20

^ For the third ----- 0*40

As for running in with lead, &c. it is difficult to fix a price.

Incidental Expenses. — These are considerable: as all the tools are furnished by the con-tractor, they are generally put at one-fifth in ordinary buildings, but in bridges, &c. one-seventh is sufficient.

Painter's Work. — The colours usually employed are lamp-black, red and yellow ochre,linseed oil, turpentine, &c. : to cause them to dry quickly, litharge is added. The labourof the painter is employed to grind the colours and to lay them on.

• For grinding a kilogramme f Ydlow'ochreof colour in oil [ Lamp-black -

The quantity of oil necessary for the above : —

Hours of aGrinder.

8*5

6*5

8*5

Kilogrammesof Oil.0*50*50*8

f Red ochre - - - -

For grinding a kilogramme-j Yellow ochre - - - -

Lamp-black - - - -

The colours being ground, they must then be mixed with a sufficient quantity of oil tobe in a condition to lay on.

Kilogrammesor Oil.

f Red ochre ----- 0*62

To mix a kilogramme *{ Yellow ochre ----- 0*73

(_ Lamp-black - - - - - 1*17

If turpentine is used for the above quantity, half the oil is employed with the samequantity of turpentine : sometimes one-eighth of litharge is added.

To paint a square metre two coats requires

Kilogrammes ofprepared Colour

Red or yellow on timber - - - - 0*12

Olive colours - - - - - 0*11

Black - - - - - - 0*08

The waste may be valued at a twentieth of the original weight.

Time necessary to mix and apply the colours —f Without scaffolding

For a square metre j with a flying ^(folding

Hours of aPainter.0*20*5