338 MODERN STEAM PRACTICE.
specially constructed in the warehouses, as shown in Fig. 215. Thesecranes are fitted for raising grain in tubs containing 21 cwts. each,at a rate of 50 tons per hour under the most favourabte conditions;
and they are also employed forlanding sacks, casks, and othermerchandise on to the quay, orto any of the warehouse floors.The lifting chain has an extremeränge of 130 feet, and the jib anextreme projection of 24 feet be-yond the quay; a traversing mo-tion of 7*4 feet is given to thefoot of the jib, but this is onlyrequired for the largest dass ofvessels. The motions are all ef-fected by hydraulic power, underthe control of one man stationedon ä platform in the tower. Thegrain is filled into tubs in thehold of the vessel, and to find thebest form for these tubs has beenmatter of some difficulty. Thefirst form used was the ordinarytipping tub, which has by longexperience been found to answerbest for the discharge of coal,salt, gravel, &c. The next form tried required no tipping, but wasfitted with a cone to deliver the grain through the bottom. Theform that proved on the whole most satisfactory also requires notipping, and is fitted with a butterfly valve in the bottom; when thetub is in position for emptying into the upper receiving hopper P,this valve is opened by a lever from the platform on which theman is stationed to work the crane. The time required by this tubfor emptying itself depends on the kind and quality of the grainwhich it contains: with wheat in good and dry condition it is fiveseconds, with barley seven seconds, and with Indian corn fromnine to ten seconds.
The hopper P (Fig. 216), into which the grain lifted by the crane tothe top of the warehouse is dropped from the tub, holds about 8 tons,and from this hopper the grain is diverted into two streams, and
Vertical
Plan-
Fig. 214.—Distributing Fan.