Chap. X.

VALUE OF ARTIFICERS’ WORKS.

899

together, for a cube metre of work, occupies ten hours of labour; placing rods for hurdleson a square metre 0*65 hours, which amounts for a cube metre of work to 3*25 hours : thetime necessary for spreading the sand is about 0 25 hours per square metre, whichamounts to 0'75 hours for a cube metre of work. The workmen usually have higherwages than the labourer; and the incidental expenses to be added are one-twentieth.

Carpentry. — The labour of this work includes the setting out at large the price ofthe timber, &c., the carriages, sawing, framing, and taking it to pieces in the yard;removing it to its destination, and raising the same in its place. The following calcu-lations suppose the use of oak timber ; with regard to fir, birch, chesnut, and other qualities,it will be easy to form a judgment of the proportion according to which it will be necessaryto reduce the quantity of labour, which depends on the hardness and specific gravity of thetimber.

Mean.

To make a mortise requiresTo make a tenon

* at least - 1 *00

at most - - 2 -00 f

I* at least - - 1*251

L at most - - 2*25 J

Halving the ends of plates or other timbers - -

For a square metre in joints at the ends of brestsummer, &c.which gives for one joint, supposing the piece to be 25 cen-timetres square, and at the joint 50 centimetres in length -Supposing the piece 35 centimetres square, and at the joint 1metre in length ------

For common framing - - - - -

1*50

1-75

100

1*31

3-68

dovetailing ------

boring a metre in length for bolts -

boring the timber when fixed -sawing a square metre of timber on tresselssawing in the yard a square metre of the ends of timbercutting off the heads of piles with the hand-saw for a square metresawing a square metre of planking with dittolining out and squaring for use - -

To fix a kilogramme of iron when the iron is to be let indrive in or pull out ah iron pin -

1

Hours of aCarpenter.

3*25

1 0010-50

2-50

500600i *a>

300

1-40

5-00

- 1050

- 12-50

1-500 20

- 015

Carpenter’s work may be divided into several kinds: as that for foundations or scaffold-ing, which do not require timber to be squared or prepared; it is equally useless to reduceit to one thickness, except where planks are required to unite in a very exact manner: thelabour is reduced to framing done on the spot, and fixing.

Temporary bridges and centres to vaults require that the timbers should be preparedafter a working drawing, and the framing put together in the yard, but not wrought onthe face : with regard to the carpentry of timber bridges, it is done agreeably to a drawing;the framing prepared and put together in the yard, and the faces wrought.

There are also works executed after a drawing that do not require to be wroughtentirely, as horizontal sleepers or joists and binding pieces, which are generally faced inthe yard, cut to a length and fitted at the place, the price of which differs from that ofthe timber.

Planking and Piling.

Preparing a pile for scaffolding, forming the head, and fixing the shoe

Letting in the shoe, weighing 5 kilogrammes at 0-20 hours for each

Do. for a pile used in foundations ------

Letting in the shoe, weighing 10 kilogrammes at 0-20 hours for eachTo sharpen and prepare a lineal metre of sheet-planking, and putting on theshoes if not let in

If the joints are grooved and tongued -For fixing the sheet piles -

which gives for a sheet pile, 5 metres long, if the jointsare square, 5 metres at 0-20 hours for eachPut into the frame or placed -

If the joints are grooved and tongued, 5 metres at 0*80 hours foreach .

Put into the frame ------

If the shoes of the weight of 5 kilogrammes are let in, we mustgrammes at 0-20 hours for each -

1-000-20

4-000-20add 5 kilo-

Parts of anHour.

1- 251-00

2- 502-00

0-20

0-80

0-20

1-20

4-20

1-00

3 m 2